Żukowo Railway Bridge

Żukowo Railway Bridge

Project Details

Category:

Client: PKP Polskie Linie Kolejowe S.A.

Date: 12.2013

Project Description

Full inventory of construction has been done before the calculation and modeling the structure of the bridge.

Dynamic analysis was performed, which identified the natural frequencies and corresponding damping parameters. In addition, the real dynamic load was simulated – locomotive ST44, a set of two locomotives and special vehicle Norca 32 for different speeds.

Object details:

  • Type of construction: railway bridge
  • Constructional height of span: 5.4 m
  • Effective span: 3×32.0 m
  • Overall length: 98.5 m
  • Overall width: 6.25 m
  • Spacing of girders: 2.2 m