Sheet pile walls, abutments design, pile settlements
Project Details
Category: Geotechnical design
Client: POLWAR S.A.
Date: 03.2016
Project Description
It was a complex executive project of redesigning two existing bridges along the Central Rail Lane CMK containing several aspects of geotechnical design, including an existing pile settlements assessment, abutment design and temporary sheet pile walls, designed to keep trains moving through the bridge during the whole executing time of a bridge.
Object details:
- Type of construction: rail bridges
- Effective span: 29.4m and 23.4m
- Overall length: 30.3m and 24.3m
- Overall width: 12.18m and 23.38m