Prabuty – Mleczewo Railway Bridge
Project Details
Category: Dynamic analysis
Client: INTOP Warszawa Sp. z o.o.
Date: 08.2013
Project Description
Static and dynamic load tests were performed. A calculation model was made in SOFiSTiK software. The scope of research during the load test involved the static deflection and deformation measurement of the structure in the middle of the span. It also included measurements of vertical displacements for the bearings, abutments and span. In dynamic test accelerations of spans were checked. Additional dynamic analysis was performed because of limited value of train’s speed.
Object details:
- Type of construction: railway bridge
- Effective span: 15.26 m
- Overall length: 15.78 m
- Overall width: 12.20 m