Parsęta River Bridge

Parsęta River Bridge

Project Details

Category:

Client: Skanska S.A.

Date: 10.2014

Project Description

The scope of research during testing load included: the static load test of spans, the settlement of bearings and tension measurements. In total nine static load schemes and sixty-eight dynamic load tests were realized.

Performed dynamic test loads: measurement of the spans acceleration and deflections.

Object details:

  • Section I:
    • Supporting structure: bridge crane system
    • Number of span: 4
    • Overwall length: 70 m
  • Section II:
    • Supporting structure: steel arch
    • Number of span: 1
    • Effective span: 104.5 m
  • Section III:
    • Supporting structure: bridge crane system
    • Numer of span: 6
    • Overwall length: 132.5 m