MD-27 Road Bridge
Project Details
Category: Expert assessments
Client: Metrostav S. A.
Date: 05.2016
Project Description
The main task was defining baring capacity. Structural and strength analyses were undertaken to consider the ability of the bridge to carry the trucks. Calculation model of one girder was created in the SOFiSTiK software.
The construction consists of 14 prefabricated concrete girders „Wągrowiec” type. In the calculation model the cross sections of the girder was simplified to I-section.
Object details:
- Effective span: 14.50 m
- Overall length: 15.30 m
- Overall width: 6.90 m
- Number of spans: 1