Gdynia – Tczew Railway Bridges
Project Details
Category: Load tests
Client: MOSTY Gdynia s.c.
Date: 08.2015
Project Description
Three railway bridges with the same construction were examined: no. 727 Tczew – Malinowo, no. 730 Zajączkowo Tczewskie ZTD – Suchostrzygi and no. 735 Górki – Zajączkowo Tczewskie ZTD.
Numerical models of constructions were made in SOFiSTIK software. The scope of research during testing included deflection measurement. Also measurements were performed for settlements of supports and bearings.
Objects details:
- Effective span: 14.20 m
- Overall length: 13.00 m
- Overall width: 5.10 m