Barczewo Road Bridge
Project Details
Category: Expert assessments
Client: Primavera Furniture Sp. z o.o.
Date: 11.2015
Project Description
The main tasks were surveys of the object as well as structural and strength analyses. The analyses were undertaken to consider the ability of the bridge to carry trucks.
A numerical model of construction was created in SOFiSTiK software.
Object details:
- Type of construction: road bridge
- Number of girders: 5
- Spacing of girders: 1.15 m
- Effective span: 27.30 m
- Overall length: 27.50 m
- Overall width: 6.15 m